what we do

 

"Phillips 66 at Borger appreciates
the performance that USI displayed
during the spring FCC turnaround.
It had the most discovery work of
any turnaround I have ever led, and
USI was able to adapt to all
situations. The leadership and excellent supervision that USI has always brought to Borger, I believe, is the main reason this was able to be a successful event.”
- Phillips 66 Refining, FCCU project, Texas

USI Industrial Services
4266 Hwy 1
Marksville, La. 71351
(318) 240-8766 Office
(318) 240-8769 Fax

Featured Project: P66

                       
Project Name:  Phillips 66 Coker Drum Project
Location:  Ponca City, OK
Project Type:  Capital Project
Owner:  Phillips 66
Project Details: 
  • Project was completed ahead of schedule, under budget and with zero leaks at start up.
  • Built and installed the main components of a Coker Unit. Installation occurred in a 33-day outage in September 2013.
  • Set two 230-ton Coke Drums onto temporary stands. The drums arrived from Japan and were transported in early 2013.
  • Constructed a new Super Structure around these drums. The Super Structure totaled 231 tons of steel.
  • Installed all piping associated with Coke drums.
  • Built the new Penthouse (i.e., Drill house) with the Derrick structure and all piping that runs the length of the Penthouse. The Penthouse and Derrick structure is one unit weighing 500 tons. This was a single lift at a 430-foot radius.

USI Industrial Services used one of the
largest cranes in the world to complete
this project.